A project manager believes that modifying the scope of the project may provide added value service for the customer. The project manager should( ).
A.assign change tasks to project members
B.call a meeting of the configuration control board
C.change the scope baseline
D.postpone the modification until a separate enhancement project is funded after this project is completed according to the original baseline
查看答案
你可能感兴趣的试题
第74题
()is not primarily used to protect the correctness and integrity of data。
A.CA certification
B.Identity authentication service
C.Digital signature
D.Intrusion detection system
答案解析与讨论:https://www.ruantiku.com/shiti/520249543.html
()is not primarily used to protect the correctness and integrity of data。
A.CA certification
B.Identity authentication service
C.Digital signature
D.Intrusion detection system
答案解析与讨论:https://www.ruantiku.com/shiti/520249543.html
第63题
关于质量审计目标的描述,不正确的是()。
A、强调每次审计都应对组织经验教训的积累做出贡献
B、识别全部违规做法、差距及不足
C、分享所在组织或行业中类似项目的良好实践
D、积极主动地提供协助,以便确定项目过程是否可控
答案解析与讨论:https://www.ruantiku.com/shiti/4588729387.html
关于质量审计目标的描述,不正确的是()。
A、强调每次审计都应对组织经验教训的积累做出贡献
B、识别全部违规做法、差距及不足
C、分享所在组织或行业中类似项目的良好实践
D、积极主动地提供协助,以便确定项目过程是否可控